For high -quality tile laying, two days will be needed. Before buying, calculate how much tiles you need and purchase the entire volume with a small margin at once.
Before laying, the surface should be even, dry and smooth. Lay the waterproofing layer. Remove the jambs and door skirting boards. Make markings to make two intersecting lines.
Approach about the tiles how it will look. As much tile as possible should come in, while as little trimmed from all sides.
After determining the location of the tile, remove everything and apply a spatula or a special spatula glue on 1 sq. M of the floor surface. Start with the far corner of the room.
Put the tiles on the glue and carefully, slightly press it on glue. Lay the tile along one line. Some tiles when laying require compliance with a certain distance. Special dividers are suitable for this. Make sure that the tile is on the same level.
Using the cutter on the tile, prepare it to lay the remaining distance near the walls. When determining the required size, consider the necessary space for the primer.
When the glue is completely dry, a primer for ceramic tiles is applied using a scraper with a rubber lining. It is important that the solution is in every gap. An excess solution is easily removed with a damp sponge. Then wipe dry dry dry.