Features and criteria for installing gypsum plasters
Paul is, first of all, the initial basis for further flooring, for example, linoleum or laminate, parquet or ceramic tiles. If you are going to lay a prefabricated floor, then it is put directly on concrete or wood overlap.
If necessary, the floor is aligned, a screed is made and a substrate or insulation is laid. The installation of the floor is recommended to do at low temperatures and after work it is necessary to give the slabs time to lay down, “adapt”. Then you can glue them with each other.
Before proceeding with the installation, the floor must be cleaned from dirt, dust and garbage. It is also necessary to close all the cracks and cracks with putty, and after drying you can use the leveling backfill.
The most important criteria for laying a gypsum plastic floor:
– The floor should be as smooth as possible;
– The joints between the sheets in the doorways do not make;
– For greater moisture insulation, the joints of drywall plates can be sealed with a special ribbon;
– On top, drywall should be covered with putty or primer in several layers.
Such work is done in a quick time. If desired, you can do it yourself. Paul from drywall has increased sound – and thermal insulation.