The main rules and stages of the implementation of the floor screed
In order to perform the floor screed, you need to know the sequence of operations.
First of all, it is necessary to mark. To do this, using the level, we find uneven (relative to the room) of the place and carry out zero marks around the entire perimeter on them.
The following that needs to be done is to set the beacons on the floor to apply the solution. A layer of solution in the floor screed can differ in its thickness, since the floor level is different. In order not to spend a large amount of solution, it is necessary to additionally buy a expanded clay stone and pour it before pouring the solution on the floor.
In order to prevent cracks from screed, a special metal mesh is mounted in it. For better drying, after the solution is applied, it is necessary to cover the screed with a film made of polyethylene. If the room is hot enough, it does not interfere with moistening the solution until completely dry.
If you plan to use the finishing material in one room in one room in one room (linoleum, parquet, tiles, etc. D.), then the level of filling the screed should take into account the thickness of the material. When on the floor is a difference in height from 1 to 1.5 cm, the screed is performed by a self -leveling mixture.