Preparation of flooring for laminate laying
Lay the laminate on a flat surface. The floor must be aligned, so that the laminate lasts longer, did not start making a creak a week after laying or did not at all go out. And he did not have to remake him.
Laminate can be placed on wood or on linoleum, but the main thing is that the floor is even, without humps.
You can align the floor in different ways. You can prepare floors for laying a laminate using concrete. First, a concrete screed is made, then the floor is poured by a self -leveling solution, and plywood is laid on it, resistant to moisture. The tree is better attached to the tree, which means that the laminate will lie on the plywood reliably. The laminate itself needs to be laid no earlier than 25-30 days, since all this should dry well.
Also, adjustable floors can be made under the laminate. They are made from adjustable plywood or from adjustable lags. The design of adjustable lag is regulated using a special tool and, thereby, the desired floor level is adjusted. But such false sexes take the space between the floor and the ceiling, therefore, if you have low ceilings, then it is better to use the adjustable plywood. The installed plywood is fixed on the bolts. Sex level, in this case, is regulated using a special key. Plywood is laid in several layers and fixed using self -tapping screws.
Laminate laid on a qualitatively aligned floor will serve you for many years.