The economy and speed of building a house using frame technology
The set of the whole house is made for 1-2 days at the factory. According to frame technology, transportation of materials for the construction of houses does not need any special transport. For transportation, sets must be packaged in moisture -proof material to avoid the possible occurrence of rotting.
For frame houses, a rather low degree of factory readiness, for this reason, the main work on decoration and assembly moves to the construction site, as a result, the construction cycle is significantly increased (assembly of this kit takes from 3 weeks to 2 months).
Elements and details of the frame that are made at the factory are delivered to the site, where they are assembled in the frame. After that, the skeleton of the house is insulated, its lining and finishing.
Installation of a frame for a two-story building with an area of about 200 square meters of medium complexity will take 3-4 days. After that, it will be possible to close the roof using waterproofing material. Warming and wall sheathing can take from 1-2 months. The general cycle of such construction – from its beginning at the factory and to delivery to the customer – is at least four months.