Planning and stages of interior decoration
Does any value have a sequence of finishing work? It definitely has. The general finish plan is drawn up so that each of the next step is not reflected negatively at the work that has already been done.
Specialists who carry out apartments recommend performing work according to the following plan:
-Layout of the apartment, installing walls (in the event that it is necessary).
-Wiring, replacing water pipes and sewage wiring.
-Alignment of the walls, their putty. In the event that the tile is used as the main finishing material for the walls, then it is based on this step. Next is the installation of tiles on the floor.
-Ceiling repair.
-Installation of doorways and installation of the doors themselves.
-Glue wallpaper.
-Flooring laminate, carpet, parquet. Finishing work in the bathroom and bathroom.
Adhering to this plan, you protect yourself from many problems, the prerequisite of which can be a different sequence of execution of the stages of the finish. Such problems can be, for example, spoiled carpet, if you put it before the wall decoration. Either spoiled wallpapers if you want to start wiring after you have already done wall decoration.