Materials, technology and stages of high -quality wall construction
After the “endurance” of the foundation and the achievement of concrete the necessary strength we take to build the foundation walls. For their arrangement, FSB blocks and a full -bodied brick are used.
Arrangement of steam – and waterproofing
For equipment for waterproofing the foundation walls, we use bentonite geomembrane and roll waterproofing “Tefon”. To achieve greater efficiency, we carry out their additional processing with rubberized mastic.
Drainage system and communication
We build a drainage system around the perimeter of the foundation with the output of drainage pipes into wells. We bring communication to the house (gas, water, sewage, electricity). Then, make the backfill of the soil.
The construction of the bearing walls
After the end of work on the overlap of the basement floor, we go to the next stage of construction – the construction of the walls of the first and second floor. For these purposes, we use a porous brick Rauf (Germany).
INFORMATION OF Ventilation
Directly in the load -bearing walls, technological niches are laid, which are used to arrange the ventilation system and laying the pipes of sewer drains.
Lands and inserts
In the door and window openings, concrete jumpers are installed, which are used as a support for the next row of brickwork.